SHELL |
Website: http://www.shell.com |
|
|
|
|
|
|
|
|
T & OE - Shutdown - Total Reliability Review Instrument |
Globally Applied
|
Whole Portfolio
|
The development of a process and package for reviewing the planning and execution of shutdowns for offshore and onshore facilities |
|
|
T & OE - Shutdown - Tracking Tool |
Globally Applied
|
Whole Portfolio
|
This is a tool designed and developed for Shell for the tracking of activities and meetings, which are pivotal to the successful execution of a shutdown |
|
|
T & OE - Maintenance System and Data Review/Action Plan for EP Asia |
EP Asia
|
Malaysia, Brunei & Australia
|
This is a tool designed and developed for Shell for the tracking of activities and meetings, which are pivotal to the successful execution of a shutdown |
|
|
T & OE - Meeting Action Tracker |
Globally Applied
|
Whole Portfolio
|
A tracking process and tool for leadership used as part of the Leadership training course globally |
|
|
EPE - Operational Reliability Improve Process |
EP Europe
|
UK, Netherlands & Norway
|
A Process and Database linked into SAP for the tracking and recording of the Top Ten Utilisation, Integrity or Cost issues and their close out through RCA (Route Cause Analysis), EIT (Equipment Improvement Team), RBI (Relentless Business Improvement - 6 Sigma), Design Change, Other |
|
|
EPA - Project Management SAP PM |
Malaysia / Brunei
|
Whole Portfolio
|
Assessment, Scoping, Project Management and Process design for SAP PM Minimum Standards/ Guidelines, Verification, and Data Cleansing |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
2005
|
|
|
|
|
|
|
.jpg) |
SHELL |
Website: http://www.shell.com |
|
|
|
|
|
|
|
|
MSAT |
Syria
|
Whole Portfolio
|
Maintenance Strategy Alignment Tool (M-C) - Alignment of maintenance strategies across all asset using analysis of best practice, delivering typically a saving of 30% |
|
|
MSAT |
Nigeria
|
Whole Portfolio
|
Maintenance Strategy Alignment Tool (M-C) - Alignment of maintenance strategies across all asset using analysis of best practice, delivering typically a saving of 30% |
|
|
PtL Oman |
Oman
|
Whole Porfolio
|
The PtL (Produce the Limit) methodolgy uses a system to prioritise opportunities to focus implimentation on the biggest wins, and leverage expertise for other oportunities |
|
|
TR Maintenance & Integrity Review Development for OR&A and Projects |
Globally Applied
|
Development of a Total Reliability review process to be carried out globally, encapsulated within a user friendly package, employed for the Project phase of development (Identify, Select, Define, and Execute) including 20 elements including topics such as plant maintenance optimisation, information managment, and Total Cost of Ownership |
|
|
TR Maintenance & Integrity Review Instrument for Operations |
Globally Applied
|
Development of an interactive package for Operational Total Reliability review process |
|
|
CTR Consolodation for PTL |
Netherlands
|
Global Solutions
|
Construction of a consolidation tool to allow rapid summarisation and analysis of multiple CTR (Cost Time Resource) template data sources |
|
|
FAIR +ER Process and Database Development |
Globally Applied
|
Development of FAIR +ER process methodology and database to facilitate a global equipment integrity review |
|
|
TR Production & Logistics Review Development for OR&A and Projects |
Globally Applied
|
Develepment of further 10 Total Reliability Elements for Prodoction and Logistics under the OR&A (Operations Readiness and Assurance) and Projects remit |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
.jpg) |
STATOIL |
Website: http://www.statoil.com |
|
|
|
|
|
|
|
|
Pilot - Modelling and Analysis of Reliability and Maintenance |
Norway
|
Gullfaks A
|
Modeling of Availability (Profi-C) for Oil Export system and analysis of performance from Maintenance History (Look-C) in SAP to produce equivalent |
|
|
|
|
|
|
|
2004
|
|
|
|
|
|
|
.jpg) |
ROLLS ROYCE
|
Website: http://www.rollsroyce.com |
|
|
|
|
|
|
|
|
Benchmarking and Performance Analysis |
UK
|
Elgin-Franklin
|
Analysis of the 7 systems contracted to Rolls Royce delivering Benchmark information (Profi-C) Gap analysis of availability (Look-C), failure mode analysis, cost benefit of skills and spares provision |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
.jpg) |
SHELL
|
Website: http://www.shell.com |
|
|
|
|
|
|
|
|
RBI Pumps |
Europe
|
Whole Porfolion
|
Relentless Business Improvement analysis of the Pump overhaul process using 6-Sigma and Lean Processes £2M of Improvement |
|
|
RBI Pipework |
Europe
|
Whole Portfolio
|
Relentless Business Improvement analysis of Pipework renewal process using 6-Sigma and Lean Processes |
|
|
MSAT |
Malaysia
|
Whole Portfolio
|
Maintenance Strategy Alignment Tool (M-C) - Alignment of maintenance strategies across all asset using analysis of best practice, delivering typically a saving of 30% |
|
|
MSAT |
Brunei
|
Whole Portfolio
|
Maintenance Strategy Alignment Tool (M-C) - Alignment of maintenance strategies across all asset using analysis of best practice, delivering typically a saving of 30% |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
.jpg) |
STAOIL |
Website: http://www.statoil.com |
|
|
|
|
|
|
|
|
Troll Wellheads |
Norway
|
Troll
|
Availability modelling (Profi-C) of 40 Topside Wellheads and analysis of maintenance strategy (Look-C) and philosophy, resulting in Data Management Opportunities and Optimisation of Maintenance |
|